Skip to content
01 / 08 · CERTIFICATE HEADER DOMESTIC ELECTRICAL INSTALLATION · CAMBRIDGE

Electrical contractor — Cambridge

Kelvin & Wren

EV charging specialists. Tested twice, documented once.

Kelvin and Wren treats a house the way a lab treats an instrument: EV charger installation, electrical inspection and testing, consumer units and rewires — every circuit measured, every reading recorded, every certificate handed over.

ESTABLISHED
2019
CERTIFICATION
SUPPLIED ON EVERY JOB
MEAN RATING
4.9/5.0 (n=187)
PUBLIC LIABILITY
£5M
SURVEYS QUOTED IN WRITING WITHIN 48 HOURS
An EV charge point mounted flush on a weathered brick wall, its cable coiled neatly on the holster under cool overcast daylight
FIG. 01 · CHARGE POINT, WEATHERED BRICK 7kW · SINGLE-PHASE
02 / 08 · SCHEDULE OF WORKS ITEMISED · 8 LINES

Schedule of works

Eight line items, set out the way a certificate is: what we do, what we test, and what you are handed at the end. Open any line for the plain-English version.

Open consumer unit with cables combed into parallel runs and a printed label beneath every circuit breaker
FIG. 02 · CABLES DRESSED, CIRCUITS LABELLED
01

EV charge point installation

7kW–22kW · DNO NOTIFICATION FILED

EV charger installation in Cambridge starts with a supply measurement, not a brochure. We confirm what your incoming supply can genuinely carry, fit the charger on its own dedicated circuit with PEN fault protection, and test the installation before it ever charges a car.

HANDED OVER: INSTALLATION CERTIFICATE · TEST SCHEDULE · DNO CONFIRMATION
02

Consumer unit replacement

18TH EDITION · EVERY CIRCUIT RETESTED

A consumer unit replacement in Cambridge is a test of every circuit the board feeds, not a swap of hardware. Each circuit is inspected, measured and labelled at the new unit, and the readings go in writing.

HANDED OVER: INSTALLATION CERTIFICATE · CIRCUIT SCHEDULE · BUILDING CONTROL REGISTRATION
03

Full-property test & inspection

EICR · EVERY CIRCUIT, EVERY READING

Electrical inspection and testing across the whole property: every circuit measured, every observation coded and then explained in plain English. EICR certificates for Cambridge homes, issued with the readings attached rather than promised.

HANDED OVER: EICR · SCHEDULE OF TEST RESULTS · PLAIN-ENGLISH SUMMARY
04

Rewires, planned circuit by circuit

VICTORIAN TERRACE SPECIALISTS

A house rewire in Cambridge's Victorian terraces is planned room by room and circuit by circuit before anyone lifts a floorboard. You see the sequence in writing first, so the disruption is scheduled rather than discovered.

HANDED OVER: CIRCUIT-BY-CIRCUIT PLAN · INSTALLATION CERTIFICATE · BUILDING CONTROL REGISTRATION
05

New circuits — kitchens & extensions

LOAD-CALCULATED · NOTIFIED

New circuits for kitchens, extensions and outbuildings, sized against a load calculation of everything already on the board — not an estimate. Notifiable work is registered with building control as standard.

HANDED OVER: INSTALLATION CERTIFICATE · UPDATED CIRCUIT SCHEDULE · REGISTRATION
06

Fault-finding & testing

INTERMITTENT FAULTS · READINGS IN WRITING

Fault-finding is measurement, not guesswork — including the intermittent faults other trades walk away from. As a fault finding electrician in Cambridge, we isolate the cause, prove it with readings, and put both in writing before repairing anything.

HANDED OVER: WRITTEN DIAGNOSIS · RECORDED READINGS · REPAIR RECORD
07

Smart heating & lighting controls

WIRED · CONFIGURED · DOCUMENTED

Smart heating and lighting controls installed on properly rated circuits, configured, and written up — so the next electrician, or the next owner, can read exactly what was done and why.

HANDED OVER: WIRING RECORD · CONFIGURATION NOTES · TEST RESULTS
08

Landlord certificates

EICR · SCHEDULED TO TENANCY DATES

Landlord certificates handled as a schedule, not a scramble: EICR inspections timed to tenancy dates, any remedials quoted line by line, and the paperwork your letting agent actually asks for.

HANDED OVER: EICR · ITEMISED REMEDIAL QUOTE · COPY FOR YOUR AGENT
03 / 08 · EV CHARGING FIG. 03 · ANNOTATED INSTALLATION
Wall-mounted EV charger with an isolator switch above, a cable run clipped down brickwork, and a hand holding a multimeter mid-reading
  • 01 · ISOLATOR
  • 02 · PEN FAULT DEVICE
  • 03 · DEDICATED 32A CIRCUIT
FIG. 03 · CHARGE POINT INSTALLATION, ANNOTATED READING IN PROGRESS

EV charging, explained in numbers

If you're comparing quotes for EV charger installation in Cambridge, these are the four decisions that matter. Learn them, and competence becomes easy to recognise.

  1. 01 7kW or 22kW

    Most Cambridge homes run on a single-phase supply, which carries a 7kW charger comfortably. A 22kW unit needs three-phase, which few houses have. We measure your supply at the survey — before recommending, not after installing.

  2. 02 A dedicated circuit, calculated

    A charger draws its full 32A for hours at a time — nothing else in the house behaves like that. It gets its own circuit, sized against a load calculation of everything already on the board, so the whole installation stays inside what your supply can carry.

  3. 03 PEN fault protection, plainly

    If the neutral conductor in the street ever failed, the metal parts of a car on charge could become live. Every charger we fit detects that condition and disconnects automatically — and we test that protection and record the result.

  4. 04 The DNO notification

    Your Distribution Network Operator has to be told a charger is connected to their network. It's a form most people have never heard of. We file it as part of the job, and the confirmation arrives with your certificate.

TYPICAL INSTALLATION: 1 DAY · TESTED, CERTIFIED, REGISTERED
04 / 08 · THE PAPERWORK CERT REF KW-2024-0112

This is what you receive. Every job.

An anonymised extract from a real Cambridge job — the itemised quote and its schedule of test results, reproduced as the customer received them. Most trades promise the paperwork. We would rather show it before you ask.

Kelvin & Wren Electrical Ltd

ITEMISED QUOTE · SCHEDULE OF TEST RESULTS
CERT REF
KW-2024-0112
PROPERTY
TERRACED HOUSE, CAMBRIDGE · ANONYMISED
OUTCOME
SATISFACTORY
  1. 01
    KITCHEN RING FINAL

    Earth-fault loop impedance — the resistance a fault current meets on its way to earth. Lower is safer.

    Zs 0.34 Ω PASS
  2. 02
    EV CHARGER SUPPLY · 32A RADIAL

    Insulation resistance — how completely the cable keeps current where it belongs. Higher is better.

    IR >999 MΩ PASS
  3. 03
    LANDING LIGHTS

    RCD disconnection — how quickly the safety device cuts a faulty circuit dead.

    TRIP 28 ms PASS
DELIVERED WITH THIS DOCUMENT: ELECTRICAL INSTALLATION CERTIFICATE · SCHEDULE OF TEST RESULTS · BUILDING CONTROL REGISTRATION
ENGINEER'S SIGNATURE
DATE OF TEST
TESTED TWICE · DOCUMENTED ONCE
REPRODUCED AT SCALE · TEST VALUES AS MEASURED · DETAILS ANONYMISED
05 / 08 · REVIEW SAMPLE SOURCE: GOOGLE REVIEWS

Reviews, treated as a sample

If you're weighing up electricians in Cambridge, don't take our word for anything. Here is the mean, the sample size, and four verbatim extracts chosen for what they're specific about.

MEAN RATING

4.9/5.0

SAMPLE SIZE

n=187

COLLECTED

2019–PRESENT

“Every circuit in the new consumer unit is labelled, and he walked me through the test sheet line by line before he left. I've never had a trade explain their own paperwork to me.”

SARA · ROMSEY, CB1

“The quote was itemised circuit by circuit and the invoice matched it exactly. No rounding, no extras discovered halfway through.”

DAVID · CHESTERTON, CB4

“When we sold the house, our surveyor commented that the EICR and certificates were the tidiest he'd seen on a property this age. That paperwork came from Kelvin and Wren.”

PRIYA · TRUMPINGTON, CB2

“They traced an intermittent fault two other electricians had given up on — and showed me the readings that proved where it was before they fixed it.”

MARK · GIRTON, CB3
VERBATIM EXTRACTS · THE FULL SAMPLE OF 187 IS PUBLIC ON GOOGLE
06 / 08 · METHOD FIXED PROCEDURE · 4 STAGES

Method: survey, install, test, hand over

The same four stages on every job, in the same order. Each stage produces a record, and the records are yours to keep.

  1. STAGE 01

    Survey

    Supply capacity measured at the meter, earthing checked, routes walked. The quote is itemised by circuit and arrives in writing within 48 hours.

    Clamp meter around an incoming supply cable beside an electricity meter, with a notebook of readings nearby
    FIG. 06.1 · SUPPLY MEASURED
  2. STAGE 02

    Install

    Work photographed as it progresses. Cables dressed and combed into parallel runs, every circuit labelled at the board.

    Hands combing electrical cables into neat parallel runs inside an open wiring enclosure
    FIG. 06.2 · CABLES DRESSED
  3. STAGE 03

    Test

    Every circuit tested twice, and the readings recorded against the values BS 7671 requires — not against a feeling.

    Professional multimeter taking a reading with probes on circuit terminals, digital display in focus
    FIG. 06.3 · READING RECORDED
  4. STAGE 04

    Hand over

    Certificate, test schedule and building-control registration delivered in writing. Nothing is left verbal.

    Torque screwdriver resting on a labelled consumer unit lid beside a printed certificate folder
    FIG. 06.4 · DELIVERED IN WRITING
07 / 08 · COVERAGE CB1–CB25 · BOUNDARY DRAWN

Coverage: Cambridge, within the CB postcodes

CITY CENTRE MILL ROAD ROMSEY CHESTERTON SCIENCE PARK TRUMPINGTON GIRTON FIG. 07.1 RIVER CAM COVERAGE BOUNDARY CB1–CB25 N
FIG. 07.1 · COVERAGE BOUNDARY, DRAWN IN COPPER NOT TO SCALE

Kelvin and Wren works across Cambridge and the surrounding CB postcodes — Victorian terraces off Mill Road, 1930s semis in Chesterton, new-builds out by the science park. If your postcode starts with CB, your street is on the sheet.

  • ROMSEYCB1
  • MILL ROADCB1
  • TRUMPINGTONCB2
  • GIRTONCB3
  • CHESTERTONCB4
  • FULL RANGECB1–CB25

One number to hold us to: after a survey, your itemised quote arrives in writing within 48 hours.

Bicycle leaning against a Victorian brick terrace at dusk while an electric car charges at the kerb, a single green indicator light glowing
FIG. 07.2 · A TERRACE STREET AT DUSK ONE INDICATOR · ON CHARGE
08 / 08 · BOOK A SURVEY RESPONSE: QUOTED IN WRITING · 48H

Book a survey

Written like a work order, answered like one. Tell us what needs doing; we measure first and quote after — itemised, in writing, within 48 hours of the survey.

WORK ORDER · SURVEY REQUEST REF: ASSIGNED ON RECEIPT
QUOTED IN WRITING WITHIN 48 HOURS · NO OBLIGATION